Traffic Notice: Appleseed Drive
From Antigonish County ↗ · Effective July 6, 2026
(July 7, 2026) – Please be advised that sidewalk construction is underway on the east side of Appleseed Drive, opposite the schools.
(July 7, 2026) – Please be advised that sidewalk construction is underway on the east side of Appleseed Drive, opposite the schools.
During construction, Appleseed Drive will be one-way only, with traffic travelling from Highland Drive toward the three-way stop at Appleseed Drive and Florence Circle.
Residents of Appleseed Drive, Alex Terrace, and Florence Circle neighbourhood will only be able to exit the area via Appleseed Drive onto Trunk 4.
This one-way traffic pattern will remain in place throughout the project, with construction expected to wrap up in late August.
Please use extra caution when travelling through the construction zone and obey all posted signs. Thank you for your patience and cooperation.